Home
You are here: Home / Blogs / Our Success Stories / The Operational Results of The Thermal Energy Center And The Drying System That Went into Operation in 2018

The Operational Results of The Thermal Energy Center And The Drying System That Went into Operation in 2018

Views: 0     Author: Site Editor     Publish Time: 18-11-2026      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

In 2018, China's wood-based panel industry stood at a critical juncture: tightening environmental regulations were accelerating the elimination of outdated capacity, and the sector was undergoing a painful consolidation. Shandong Xingang Group's decision that year to purchase a 48MW energy center and drying system from Shandong Minghung was not a routine equipment upgrade. It was a strategic move that addressed both regulatory survival and operational efficiency. Years of continuous service since then—marked by punctual delivery, low failure rates, and dependable quality—have validated that decision.



1. The Necessity of the 2018 Purchase: A Regulatory Imperative


For large and mid-sized panel manufacturers, the energy center and drying system are both the heart of the production line and a critical environmental compliance checkpoint. Traditional decentralized heat supply—multiple small hot-air furnaces operating independently—suffered from low thermal efficiency, unstable emissions, and high energy consumption. Under the intensified environmental inspections of 2018, such systems frequently became grounds for production restrictions or shutdowns. A centralized energy center in the 48MW class offered a different model: using biomass fuels (bark, reject chips, sawdust, and other production waste) to generate three heat carriers through high-temperature combustion—hot flue gas, thermal oil, and steam—each directed to drying, pressing, and glue preparation respectively. This approach solved the waste disposal problem, centralized emission control, and preserved production capacity under conditions that were eliminating non-compliant competitors. Xingang's move in 2018 was, in essence, a preemptive upgrade of its core energy supply before the regulatory window tightened further.


2. Core Functions of the Energy Center and Drying System


The energy center functions as the integrated energy hub of the panel production line. In a 48MW configuration, its operation can be summarized as “one fuel, three outputs.” Fuel burns in a combustion chamber at 900–950°C, first heating thermal oil to approximately 280°C. Part of this oil goes directly to the hot press to provide heat for board consolidation; the remainder enters a steam generator to produce saturated steam for glue preparation and wax melting. The cooled flue gas, after dedusting and temperature adjustment to around 550°C, is routed to the drying system as the drying medium. This cascade utilization of heat across three carriers achieves a thermal efficiency that decentralized furnaces cannot match.

MINGHUNG wood based panel production lineThe energy center of Minghong that Xingang purchased



The drying system is the first quality gate in panel production. After resin blending, wet fibers or particles typically carry moisture exceeding 80% and must be dried to the 8–12% range within a very short retention time, without prematurely curing the adhesive. Drying uniformity directly determines density distribution, internal bond strength, and surface quality of the finished board. Minghung's drying system was engineered to match the energy center's flue gas output precisely, with coordinated control of air temperature, volume, and residence time to keep material moisture within specification—providing the downstream forming and pressing stages with consistently acceptable furnish.

Shandong Minghung Dryer for drying wood chips, strnads, sawdustMinghung dryer for per year 300000cbm particleboard



3. Minghung's Delivery Performance: Timely, Reliable, and Proven Over Time


Continuous operation from 2018 to the present is itself the most credible testament to equipment quality. On delivery, Minghung demonstrated the advantages of a Shandong-based equipment supplier with proximity to the customer. A 48MW energy center involves multiple subsystems—fuel handling, combustion, thermal oil circulation, flue gas dedusting, and control—and the design, fabrication, installation, and commissioning sequence proceeded without bottlenecks. Xingang was able to bring the system online within the compliance window without disrupting its normal production schedule.


Low failure rates matter most on the production floor. An unplanned shutdown of the energy center's main induced-draft fan or grate drive halts the entire line, and the output losses far exceed the value of the equipment itself. Minghung's system has maintained satisfactory availability over years of operation: stable combustion, no significant decline in heat transfer efficiency, and reliable control response. This performance reflects Minghung's focused experience in panel drying and thermal equipment—its product range covers mesh-belt dryers, drum dryers, and matching energy centers, with design details informed by a practical understanding of panel production processes.


Quality is ultimately judged by operating data. Since 2018, Xingang's production scale and product mix have weathered market fluctuations, yet the 48MW energy center and drying system has remained a stable foundation throughout. At a time when many peers face the burden of environmental equipment requiring major overhauls or replacement every few years, the durability of Minghung's system has spared Xingang the hidden costs of frequent retrofits. It also confirms the maturity of Shandong's domestic equipment manufacturing in heavy-duty thermal engineering.


About us-Shandong Minghung OSB&MDF Machinery Equipment Manufacturing


MINGHUNG is a leading company in the industry of OSB&MDF making machine. With a strongfocus on producing high-quality machinery, we specialize in manufacturing thecomplete production line of Medium density fiberboard (MDF), High densityfiberboard (HDF),Particle board (PB), Oriented strand board (OSB) , Veneerable super strong particle board (LSB),Laminated board and veneer.


From A to Z, from Raw materials to the final wood based panel, we can offer you all necessary machinery. including: Wood chipper, Strander, Disc chipper, Ring flaker, Rotary drum dryer, Vibrating screener, Glue dosing and applying system, Refiner, Mat frorming line, Continuous pre-press, synchronous Cross-cut saw, Multi-layers Hot press /Continuous single layer hot press, Auto edge trimming machine line,Sanding line,etc.


MINGHUNG OSB/PB/MDF production lineShandong minghung wood based panel machinery


Our wood-based panel machinery not only serves domestic customers but also exports to countries and regions such as India, Bangladesh, Brazil, Turkey, South America, and North Africa.


photos of delivery

MINGHUNG OSB&MDF Machinery Equipment Loading

Shandong Minghung plywood peeler



Conclusion


Viewed in retrospect, Xingang's 2018 purchase secured more than a set of equipment. It locked in a safeguard for uninterrupted production and compliant emissions during a period of industry upheaval. Minghung's timely delivery protected the project window; its low failure rate preserved production continuity; its build quality delivered on the promise of long-term operation. The fact that this 48MW energy center and drying system remains in service today is the most grounded assessment of that decision.



Our contacts:

Whatsapp: +8618769900191  +8615589105786  +8619953910191

Email: osbmdfmachinery@gmail.com




Is committed to providing global customers with intelligent, efficient, and green overall solutions for panel production.

Quick Link

Product Category

Contact Us

WhatsApp: +8618769900191 
Skype: +86-15805493072
Address: New Materials Technology Industrial Cluster Zone of Zhutian Town, Feixian County, Linyi City,Shandong Province China
Copyright ©  2025 Shandong MINGHUNG OSB&MDF Machinery Equipment Manufacturing Co., Ltd. All Rights Reserved.